Builder Name:Kent Ingram   -  
Project:   Rans - S-21 Outbound   -   VIEW REPORTS
Total Hours:538.2
Total Flight Time:
Start/Last Date:May 09, 2020 - No Finish Date
 
Friendly URL: https://eaabuilderslog.org?s=S-21

Home or Last Project Picture

Jan 23, 2023     Throttle & Mixture cables mounted - (1 hour)       Category: Firewall
Had not drilled the cable ball swivels to proper size, so did that first. A 19/64” bit mice's just a bit smaller than the cables, so it was used. Mounted mixture and throttle cables into the sub-panel at lower center of instrument panel, exiting through the open eyeball swivels. I then assembled the eyeball sockets over each cable. Just one of 5hose jobs that is much easier before the engine is hung.
Also spent a considerable amount of time trying to figure out where some of the coiled wires from the panel will be going. Spent a lot of time comparing what I have physically to the drawing provided from Steinair. I'm gaining ground.


 